Two checklists an importer can hand to an inspector today: what to verify at the factory before the balance is paid, and what to re-verify at your warehouse before the wheels enter stock — each item with method, acceptance criterion and tool.
Why two checklists, not one
A steel wheel pre-shipment inspection (PSI) is the last moment a defect is the supplier's problem at the supplier's cost; once the container is sealed, an out-of-tolerance bore becomes an argument across two time zones on top of freight already paid. The goods-in check covers what a PSI never saw — flange dents from a shifted stack, strap cuts through the coating, white rust from a wet container — and builds the record a claim stands on.
Both lists assume an approved drawing for every size on the order: nearly every acceptance criterion below reads "against the tolerance on the approved drawing", because the tolerance belongs to the drawing you signed, not to a generic number in a guide.
What to have in hand before the inspector walks in
Documents
- Approved drawing per size, with tolerances and runout limits
- Proforma invoice with marking, packing, inspection and claim terms
- Supplier's draft packing list, quantity per size and brand
- Agreed sampling plan and AQL, or agreed fixed percentage
- Approved colour sample or RAL reference, plus the coating specification
- A previous batch test report as reference format
Tools
- Steel tape and rule; vernier calliper (300 mm or longer)
- PCD gauge or bolt-hole template; bore gauge
- Straight edge and depth gauge for offset
- Dial indicator on a wheel-runout fixture
- Dry-film coating thickness gauge (magnetic induction)
- Cross-hatch cutter and tape (ISO 2409); weld gauge; torch
- Camera with a scale reference; tally sheets
Checklist 1 — Pre-shipment inspection (PSI) at the factory
Documents come first: a packing list that does not match the stamping stops the inspection before any measuring begins.
| Item | Check method | Accept if | Tool |
|---|---|---|---|
| Packing list vs stamping | From every pallet, read size, brand and date code stamped on the disc against the packing list line | Sizes, quantities and brand match; no unlisted date codes | Tally sheet, torch |
| Certificate copies | IATF 16949 certificate copy names the producing plant and is in date; confirm with the issuing certification body | Valid; plant name matches the site inspected | Desk check |
| Batch test report | Contents as agreed in the PI — typically the fatigue type-test reference for each model, air-tightness for tubeless, coating thickness record | Cites the date codes in this shipment; signed and dated | Desk check |
| PCD | Measure across bolt holes by the drawing's method, at more than one hole pair | Within the tolerance on the approved drawing | PCD gauge or calliper |
| Bolt-hole Ø & seat | Measure hole diameter; confirm seat type (ball, cone or flat); inspect hole edges | Within drawing tolerance; correct seat; no tearing or burr | Calliper, visual |
| Centre bore | Measure in two directions at 90° | Within drawing tolerance and round | Bore gauge or calliper |
| Offset (inset) | Mounting-face position relative to rim centreline, from the drawing datum | Within drawing tolerance | Straight edge, depth gauge |
| Rim width & flange | Measure between flanges; check flange height and profile against the rim contour code | Within drawing tolerance; correct contour code | Tape, calliper, profile template |
| Radial & lateral runout | One full turn on the fixture: radial at both bead seats, lateral at both flanges | Within the tolerance on the approved drawing | Dial indicator, fixture |
| Rim butt weld | Inspect inside and out; run a fingernail across bead seat and flange at the weld line | Flash trimmed and dressed; no step or groove at the bead seat; no crack or lack of fusion | Visual, torch, weld gauge |
| Disc-to-rim weld | Inspect the full length; continuous or segmented as the drawing specifies | As per drawing; no porosity, undercut, crater cracks or spatter under the coating | Visual, weld gauge |
| Coating thickness | Dry film thickness at the agreed points (disc face, rim outer, inside rim) on sample wheels | At or above the specified minimum at every point | DFT gauge |
| Coating adhesion | Cross-hatch cut and tape pull on the agreed number of samples | Classification agreed in the coating specification (ISO 2409) | Cross-hatch cutter, tape |
| Coverage & colour | Inside hand holes, valve hole, bolt holes and the disc-to-rim junction; colour against the approved sample in daylight | No bare metal or thin edges; colour within the agreed difference | Torch, colour sample |
| Stamping / marking | Size designation, maximum load, date code, brand and any extra mark required in the PI | All present, legible, positioned as agreed, consistent with the test report | Visual |
| Tubeless bead seats & valve hole | Finger and torch around both bead seats; valve hole checked for burr and chamfer on both sides | Seats smooth, no scoring across the seat; valve hole deburred and chamfered | Visual, touch |
| Air-tightness (tubeless) | Review the factory leak-test record for the batch; witness a test on samples if agreed in the PI | Record covers this shipment's date codes at the test rate agreed in the PI; witnessed samples hold pressure | Factory test rig, record |
| Packing & count | Count per size against the packing list; check stacking, strapping, rust protection and container loading if it happens during the visit | Count matches; wheels cannot shift; rust-preventive or wrap as specified; loading and seal number photographed | Tally sheet, camera |
"As specified" and "as agreed" refer to your proforma invoice and coating specification. Where they are silent — colour tolerance, rust-preventive type — the inspector cannot reject on it.
Notes on the harder rows
Measure PCD at more than one hole pair and the bore in two directions; a single reading hides ovality. Runout is the most telling number on the sheet: a wheel that passes PCD and bore but runs out usually has a forming or welding fault the fleet will later blame on the tyre. The rim butt weld sits under the bead seat, so untrimmed flash becomes a slow leak on a tubeless wheel — the fingernail test is not a formality, and weld process control is exactly what IATF 16949 audits. On coating, measure inside the rim and at hand holes and the valve hole, where film thins first and rust starts in a coastal warehouse. Common bolt patterns are in the PCD chart.

Sampling plan: how many wheels to pull
Use ISO 2859-1 (AQL attribute sampling; its US counterpart is ANSI/ASQ Z1.4) at a general inspection level, with the AQL values for critical, major and minor defects written into the proforma invoice — or agree a fixed percentage per size with the supplier. The numbers are a commercial term between the two of you; what matters is that the plan is agreed before the inspector arrives and the report records the sample size actually drawn.
Three checks are 100% whatever the plan says: count per size, stamping and brand per pallet, packing condition. Dimensions, welds and coating are sample checks. A defect classification to agree in advance:
- Critical — affects function or safety: cracks, weld defects, PCD, bore or offset outside tolerance, missing or wrong load stamping, bead-seat damage on a tubeless wheel.
- Major — runout outside tolerance, coating below minimum, adhesion below the agreed class, wrong colour, illegible date code.
- Minor — cosmetic scratches not reaching bare metal, light spatter, marking slightly off position.
Checklist 2 — Goods-in QC at your warehouse
The goods-in wheel QC checklist re-verifies what transit can change, cross-checks the shipment against the PSI record, and builds the file a claim rests on. Do it before the wheels are mixed into stock — afterwards the batch cannot be isolated.
| Item | Check method | Accept if | Tool |
|---|---|---|---|
| Seal & container | Seal number against the bill of lading and PSI loading photos before breaking it; photograph doors and seal | Seal intact; number matches | Camera |
| Condition on opening | Photograph the load before unloading; look for shifted stacks, broken straps, water marks | As photographed at origin; no water ingress | Camera, torch |
| Count per size | Tally against packing list and commercial invoice as pallets come off | Quantities match per size and brand | Tally sheet |
| Transit damage | Flanges, bead seats and disc faces on every outer-layer wheel and a sample from inside the stacks | No flange dents, strap cuts to bare metal or bead-seat scoring | Visual |
| Corrosion | Strap contact points, hand-hole edges and bare-metal areas for white or red rust | None on bead seats or mounting face; light surface film only elsewhere | Visual |
| Stamping cross-check | Sample from every pallet against packing list, PSI report and batch test report | Same sizes, brand and date codes as recorded at PSI | Visual |
| Dimensional spot check | Re-measure PCD, centre bore and offset on a small sample per size | Within the tolerance on the approved drawing; consistent with PSI readings | Calliper, gauges |
| Coating spot check | Dry film thickness on a sample; edges and hand holes checked for transit chipping | At or above the specified minimum; no chips to bare metal | DFT gauge |
| Tyre fit test (tubeless) | Fit a tyre on one or two wheels per size, inflate, soap bead and valve; or mount on a yard vehicle | Beads seat cleanly and hold pressure; no leak at butt weld or valve | Tyre fitting bay |
| Document file | Packing list, bill of lading, batch test report, PSI report and goods-in record filed together per batch | Every wheel in stock traceable to a batch and test report by date code | — |
| Storage | Re-stack by the supplier's method, off wet floors, under cover | No re-strapping damage; wheels stay dry until sold | Pallets, wrap |
The tyre fit test is the one goods-in item worth the labour every time on tubeless wheels: it proves bead seat and butt weld together in minutes, with your own fitter as witness.
When something fails: the non-conformance workflow
A claim succeeds or fails on its paperwork in the first 48 hours:
- Quarantine. Move affected wheels to a marked area and tag them. Nothing under claim enters stock or reaches a customer.
- Photograph. Per defect type: a wide shot, a close-up with scale reference, the stamping and date code, the packing-list line.
- Quantify. Affected quantity per size and defect type, classified critical / major / minor; note whether it was visible at PSI or is transit damage — that decides who pays.
- Notify in writing within the claim window in the proforma invoice, with photo pack and count. WhatsApp for speed, email the same day for the record.
- Agree the disposition in writing: local rework at an agreed cost (typical for cosmetic coating damage), sort-and-accept with a credit, replacement in the next shipment, or return.
- Close out. For any critical defect, ask for a corrective-action report naming the cause and the change made — replacement parts alone do not make the next container different.
What we provide at inspection
Wheels supplied through Zhongyuan are produced under IATF 16949:2016 — certificate No. 0504999 (manufacturing of steel and aluminum wheels) and group certificate No. 0599434 — and both copies go out with every quotation. Every batch ships with its test report, and we accept a pre-shipment inspection by your own agent or a third-party company of your choice. Sizes and configurations are in the technical catalogue; certificate scans are on the Quality & Certificates page.
Frequently asked questions
What should a pre-shipment inspection of truck wheels cover?
Documents, dimensions against the approved drawing, both welds, coating, stamping, tubeless bead seats and the air-tightness record, packing and count, the sampling plan used, and a photo record — the eighteen rows of Checklist 1, about half a day's work.
How many wheels should be inspected — what sampling plan?
ISO 2859-1 at a general inspection level with AQL values written into the PI, or an agreed fixed percentage per size. Count, stamping and packing are 100% checks regardless; record the sample size actually drawn.
What happens if wheels fail inspection after arrival?
Quarantine, photograph with stamping and scale in frame, quantify per size and defect type, notify in writing within the claim window, agree the disposition in writing, and for critical defects ask for a corrective-action report.